ISAX LoopCreator 1.1
Screenshots of ISAX LoopCreator
ISAX LoopCreator Publisher's Description
Description
The choice of Excel as data source is justified because it is not required any
knowledge of relational database to set the data that will be put in the
drawings that will be created by the application.
The typicals are .dwg drawings where the engineer will have put text, strictly
not multyline, that
LoopCreator
will recognize and replace with the data found in the Excel project.
It is extremely important to consider that the job developed in the past in your
company will not be forgotten. In fact, it will be enough to modify some text in
your existing drawings to to adapt them to the content of the Excel project.
LoopCreator does not
generate drawings, but modify existing ones!
There is no limit in the number of typicals used in the project. the only bond
is that they must be in the same folder.
The Excel project must have two
worksheets, strictly called "DB" and
"GeneralInfo".
On the right it is shown an example of "DB" worksheet, where it is possible
to identify, in row 1, the texts that will be searched during the procedure
of drawings creation. In the example include in the downloadable file (one AutoCAD
drawing and one Excel project), they will be created three drawings, that
are the number of raws containing data on the Excel worksheet.
For the drawing numbering, it will be enough to add a text field, as shown
in the example, and assign a consecutive numbering in the Excel worksheet,
starting from any value and not necessarily from "1".
  In worksheet "GeneralInfo" there will be put all the repetive informations, such as the number of document, name of company, overall number of sheets, etc.
The first column ("A") is reserfed in both worksheets of Excel project, for the typical name and the common part of the file name. The column heading ("TYPICAL" e "SAVEAS FILENAME") is not taken in consideration from the software and can be freely modified.
User interface
Simple and intuitive.
It is enough to select Excel file, typicals folder and destination folder. At
this point click on button "Create drawings" and wait for the end of job.
Performance
Once initiated, the application works in background, leaving the user free to
proceed with other jobs.
From 8 to 20 seconds (depending upon the number of information to elaborate) to
compile and save a new drawing, that means more than 2000 .dwg per day!!
Look for Similar Items by Category
Feedback
- If you need help or have a question, contact us
- Would you like to update this product info?
- Is there any feedback you would like to provide? Click here
Popular Downloads
- Kundli 4.5
- Macromedia Flash 8 8.0
- Cool Edit Pro 2.1.3097.0
- Hill Climb Racing 1.0
- Cheat Engine 6.8.1
- Grand Theft Auto: Vice City 1.0
- Grand Auto Adventure 1.0
- Tom VPN 2.2.8
- HTML To PHP Converter 6.0.1
- Zuma Deluxe 1.0
- Netcut 2.1.4
- Windows XP Service Pack 3 Build...
- Vector on PC 1.0
- Minecraft 1.10.2
- Ulead Video Studio Plus 11
- PhotoImpression 6.5
- Street Fighter 3 1.0
- Auto-Tune Evo VST 6.0.9.2
- Iggle Pop 1.0
- C-Free 5.0